Operating Conditions:
The medium is secondary-loop circulating water in a heat exchange station. As a key connection point between the primary and secondary heating networks, the heat exchange station uses secondary-loop circulation pumps to deliver hot water from the heat exchangers to terminal heating equipment in residential communities, office buildings, and other facilities. This application requires pumps with moderate flow and head, flexible installation, and the capability to operate in parallel with multiple pumps.

Equipment Selected:
Our single-stage centrifugal pump range includes two main configurations: horizontal end-suction pumps and vertical inline pumps. The pumps cover flow rates from 4.32 to 1,350 m³/h and heads from 17 to 74 m, with medium temperatures ranging from -15°C to +150°C. This range meets the requirements of heating systems, particularly large-flow, low-head circulation applications.

Application Results:
The pumps are used for secondary-loop hot water circulation in the heat exchange station and provide stable operation. Variable-frequency control is used to accommodate changes in heating loads.

To further improve system efficiency, our technical team installed a jet-flow resistance-reduction and energy-saving device at the circulation pump discharge. The pipe diameter was increased from 200 mm to 250 mm. This allowed the system to maintain the required supply and return water pressure without selecting a pump with a higher head or motor power, achieving energy savings while maintaining reliable heating performance.