Project Case Study
-
2.1 Million m² Coal-to-Gas Heating Conversion Project
Operating Conditions:The medium is secondary-loop circulating water in a heat exchange station. As a key connection point between the primary and secondary heating networks, the heat exchange station…Learn More -
Cooling Water Circulation Project
Operating Conditions:The medium is cooling water containing trace scale-forming ions and rust particles from the piping system. The system requires long-term continuous operation at full load during the…Learn More -
Commercial Complex Chilled Water Circulation Project
Energy-saving pump units with diesel backup served large farmland irrigation during peak season and grid outages.Learn More
